RHI amendment for heat meter replacement Includes
IRMA amendment Production of pipework schematic drawing showing meter RHI amendment Does not include site visit. If this is required an additional charge will be added.
Notes: Assumes there is an existing IRMA and pipework schematic drawing showing the meter locations and both can be made available to Myriad.
Note that if the client does not have these documents, then they are available from the OFGEM portal which Myriad can recover if the client provides access.
The RHI should be notified within 28 days of the meter change.
- Parts that are available in the warehouse are typically processed within 1-2 business days.
- Some parts may have an extended shipping time of 3-4 weeks due to supplier lead times. If an item is subject to delay, we will notify you as soon as possible.
Please refer to our returns policy
Please refer to our warranty policy