Design and Technical Support - 5h block
Design and Technical Support - 5h block
Design and Technical Support - 5h block
Design and Technical Support - 5h block
Design and Technical Support - 5h block
Design and Technical Support - 5h block
Design and Technical Support - 5h block
Design and Technical Support - 5h block
Myriad Plantroom Services

Design and Technical Support - 5h block

£725.00 In Stock Sold out

Our stock is held at various locations in the UK and also abroad at key supplier sites.
Please do not collect unless previously agreed.

Please note: We will be closed from 24th December 2024
to 2nd January 2025
. No parts will be ordered or dispatched during this
period. Normal service resumes on 3rd January 2025.

CODE: TSx5
Categories: All

Typical delivery times

If the part is located at the Myriad UK warehouse then we can offer "Next day delivery" if you order before noon and specifically ask for EXPRESS.

If the part is stocked in the UK but not at Myriad then delivery times are typically 3-4 days.

If the part is stocked abroad then delivery will be longer.

Our stock is held at various locations in the UK and also abroad at key supplier sites.

If delivery time is critical then please ask us for the delivery time in the chat prior to ordering or once ordered we will respond to inform you of the expected delivery time.

12 MONTHS GUARANTEE

  • Description
  • Reviews

Overview

This package of time provides our customer with technical support for a range of activities including:

  • Boiler on-site operational/technical support outside the standard service customer SLA
  • Remedial design to fix operational issues such as boiler cycling, insufficient heat, etc
  • Heating system design review and amendment, including CAD work
  • Complex fuel storage design, design of fuel storage and fuel transport solutions taking into account wood fuel types available, biomass boiler operating duty, delivery frequency, material storage regulations
  • New/Upgrade heating system design
  • RHI support/advice
  • Solar PV ground mount feasibility studies
  • Biomass boiler or Heat pump integration design
  • Support for biomass boiler emissions testing/approvals
  • Site visits to review heating system operation/design/efficiency/etc
  • Gas CHP sizing and integration

 

Validity & Expiry

The support period shall commence at the moment the purchase is completed. Myriad will log time in 15 minute increments, or part thereof.

Terms, Conditions & Exclusions

  • Technical support does not guarantee that a breakdown will be resolved,
  • Technical support does not mean any visits are made,
  • Any engineers visits are chargeable and are not included in the technical support,
  • Technical support does not include any costs for parts,
  • Technical support does not cover warranty,
  • Technical support is provided as is and returns are not permitted for this sale.

Recently Viewed