0180kW RHI_B_175 RHI Tariff & 2x Solar Bayer 180kW - Space heating
0180kW RHI_B_175 RHI Tariff & 2x Solar Bayer 180kW - Space heating
0180kW RHI_B_175 RHI Tariff & 2x Solar Bayer 180kW - Space heating
0180kW RHI_B_175 RHI Tariff & 2x Solar Bayer 180kW - Space heating
Sale
Myriad Products

0180kW RHI_B_175 RHI Tariff & 2x Solar Bayer 180kW - Space heating

£0.00 In Stock Pre-Order Sold out

If the part is available at the Myriad UK warehouse, we process your order on the same day or the next working day.

If your ordered part is not in our warehouse, delivery may take up to 4 weeks due to shipping, customs, and potential supplier delays.

Notify when available
CODE: RHI_B_175
Categories: All, RHI Tariffs

Part Number: RHI_B_175


Delivery times

If the part is available at the Myriad UK warehouse, we process your order on the same day or the next working day.

If your ordered part is not in our warehouse, delivery may take up to 4 weeks due to shipping, customs, and potential supplier delays.


Stock Locations

Our inventory is held at various locations across the UK and at key supplier sites abroad.

If delivery time is critical, email us at parts@myriadservice.co.uk before ordering, or we’ll confirm the ETA after your order.


12 month guarantee

Please review our warranty policy

  • Description
  • Shipping and Refund

Tariff and a used boiler, or the tariff can be taken and applied against a brand new boiler. Myriad can supply a new Herz boiler if required, see here: www.myriadproducts.co.uk

RHI Tariff

  • Accredited boiler output: 180kW
  • Tier 1 hours: 1314
  • Tier 1 rate: 6.71 p/kWh
  • Tier 2 rate: 1.77 p/kWh
  • Accreditation date: 2015.08.25
  • Accredited for: Space heating

Equipment details:

  • 1x Solarbayer 100kW
  • 1x Solarbayer 80kW
  • 5,000ltr buffer tank
  • Backflow pump and 3 port valve
  • Flue - twin walled stainless

Boiler usage:

  • Low (average 18% duty)
  • Not used in past 5 years

 

  • Price is Ex works current site - North Yorkshire
  • RHI administration/application costs etc are excluded
  • 50% deposit required and 50% required immediately prior to boiler collection.

Shipping

  • Parts that are available in the warehouse are typically processed within 1-2 business days.
  • Some parts may have an extended shipping time of 3-4 weeks due to supplier lead times. If an item is subject to delay, we will notify you as soon as possible.

Returns

Please refer to our returns policy

Warranty

Please refer to our warranty policy

Recently Viewed